0 of 11 Questions completed
Questions:
You have already completed the question before. Hence you can not start it again.
Question is loading…
You must sign in or sign up to start the question.
You must first complete the following:
0 of 11 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Fill in the blanks
cubic / pascal / origin / manufacturer / SANS / year / serial / edition / minimum / approved
The markings that must appear on the Date plate of all pressure equipment are:
— name of the ;
— country of ;
— of manufacture;
— manufacturer’s number;
— reference number, date and of the health and safety standard;
— design pressure in units of ;
— design temperature for both and maximum degrees Celsius;
— capacity in metres;
— unique mark of an inspection authority as applicable; and
— the hazard category in accordance with the requirements of 347.
In respect to the Pressure Equipment Regulations, from the list below, select the option stating who may recharge a fire extinguisher
In respect to the Pressure Equipment Regulations, from the list below, select the option stating who may inspect and test a transportable gas container
In respect to the Pressure Equipment Regulations, from the list below, select the option stating how do you obtain a steam generator certificate of registration
In respect to the Pressure Equipment Regulations, from the list below, select the option stating which changes in the status of a steam generator will not require you to forthwith notify the provincial director
In respect to the Pressure Equipment Regulations, from the list below, select the option stating what will not cause a steam generator certificate of registration to lapse
In respect to the Pressure Equipment Regulations, from the list below, select the option stating what must not be done when you modify your steam generator
You want to install a new gas system and gas appliance on your premises. From the list below, select who must do the installation
You want to install a new gas system and gas appliance on your premises. From the list below, who must issue the certificate of conformity
From the list below, select 3 applicable duties of the user of pressure equipment
From the list below, select 3 types of pressure equipment which are excluded from the requirements of the pressure equipment regulations